Asset 8

Case Studies

Case Study: Mezzanine & Fit Out, Cirencester Case Study: Mezzanine & Fit Out, Cirencester Mezzanines

Case Study: Mezzanine & Fit Out, Cirencester

Turnkey Mezzanine & Fit Out Project, Cirencester

• Complete design and build of a mezzanine floor in Cirencester designed for mixed classroom and storage use.
• 58m2 mezzanine floor
• Full CAD/CAM design with structural calculations.
• Designed to fit above an existing showroom area.
• Upon design sign off, manufacturing was quickly undertaken and steelwork erected over several days.
• Once the structure was built, it was then ’fire rated’ and suspended ceiling installed to comply with Building Control Regulations.
• The classroom was then built on top of the mezzanine using stud and plasterboard with insulation in the cavity. Windows and door installed along with the suspended ceiling.
• Building control approval undertaken by Advantage making the end to end process extremely straight forward for the customer.
• All our mezzanines are provided with CE mark certification and full loading and structural calculations.
• The project was finished on time and on budget

 

CALL NOW for more information: 01905 622830 or Email: sales@advantage-uk.com

About Advantage Mezzanines

Advantage has specialised in the design and installation of mezzanine floors and their associated services for more than 25 years, providing our services to hundreds of clients nationwide. Read more

How can we help?

Get in touch with our sales team who will be happy to discuss your needs and provide you with a no-obligation quote.