|
Storage Mezzanine Case Studies: |
|
Furniture Retailer Worcestershire |
|
On-Line Warehouse Facility Nottingham |
|
Printing Manufacturer, Worcestershire, Working Out
of Hours |
|
UK Distribution Centre, Gloucestershire, Storage
Space Doubled |
|
National Distribution Warehouse, Tewksbury |
|
On Line Distribution Warehouse, Worcestershire,
Built in 2 days |
|
Hydraulic Filtration Equipment Manufacturer,
Cotswolds |
|
Facilities Management Central Stores, Malvern,
Completed one weekend |
|
Furniture Manufacturer, West Midlands |
|
Automotive Distributor, Worcestershire, Before
and After Photographs |
|
Plastic Mouldings Manufacturer, Worcestershire,
Built in one weekend |
|
National Distribution Warehouse, Gloucester |
 |
|
| |
|
|
|
|
|
FREE no-obligation
consultation, advice
and quotation:
Call 01905 622 830 |
|
On Line Distribution Warehouse,
Worcestershire, Built in 2 days
This 120 square metre storage mezzanine floor was built in 2 days.
Designed to suit ground floor shelving to be installed as a 2nd phase, the
columns were spanned 7 metre in the one direction.
To maximise storage space, yet comply with Building Control, the staircase
was located centrally with a triple flight and mid landing. The photographs
illustrate the standard black kicker/fascia, powder coated handrail posts,
chequer plate stair treads and galvanised horizontal handrailing supplied on a
standard Advantage Storage Mezzanine Floor.
|