Design & Build Case Studies: |
|
Automotive Distributor, Worcester, Before and
After |
|
Fire Service Training, Workshop and Stores
Facilities – Before and After Photographs |
|
Cleanroom Equipment Manufacturer, West Midlands,
Difficult Installation |
|
Medical Instrument Specialist, Gloucestershire |
|
Medical Equipment Offices and Workshop, Cotswolds |
|
Defence Contractor , New Office facility,
Mid Wales |
|
Education Mezzanine Floor, Shropshire College |
|
Cleanroom Equipment Manufacturer, Worcestershire,
Mezzanine Built on Nightshifts |
|
Defence Contractor, Herefordshire, ‘Before and
After’ |
|
Mechanical and Ventilation Services Manufacturer,
West Midlands- Difficult Installation |
 |
|
| |
|
|
|
|
|
FREE no-obligation
consultation, advice
and quotation:
Call 01905 622 830 |
|
Cleanroom Equipment
Manufacturer, Worcestershire,
Mezzanine Built on Nightshifts
Advantage Storage and Handling were selected as the Principal Contractor for
this Design and Build facility.
Working with the nominated CDM Co-ordinator, Advantage provided a detailed
Schedule of Works, itemising each trade and man days required!
Prior to the commencement of works, risk assessments and method statements
were prepared for each trade with the Mezzanine floor being built during night
shifts and all other works carried out during normal working hours.
Once the Mezzanine build was complete, the ground floor one hour fire
protection and lighting promptly followed, allowing no further disruption to the
existing production areas.
On the first floor, external upvc windows were then fitted together with,
perimeter drylining, internal office partitions for offices, rest room and
stores areas.
Services included, air-conditioning, a new electrical distribution board,
electrics, data cabling, smoke detection and kitchen area with ‘Saniflow’.
|
Click in image(s) for larger versions: |
| |
|
|
 |
 |
|
| |
|
|
|