Design & Build Case Studies: |
|
Automotive Distributor, Worcester, Before and
After |
|
Fire Service Training, Workshop and Stores
Facilities – Before and After Photographs |
|
Cleanroom Equipment Manufacturer, West Midlands,
Difficult Installation |
|
Medical Instrument Specialist, Gloucestershire |
|
Medical Equipment Offices and Workshop, Cotswolds |
|
Defence Contractor , New Office facility,
Mid Wales |
|
Education Mezzanine Floor, Shropshire College |
|
Cleanroom Equipment Manufacturer, Worcestershire,
Mezzanine Built on Nightshifts |
|
Defence Contractor, Herefordshire, ‘Before and
After’ |
|
Mechanical and Ventilation Services Manufacturer,
West Midlands- Difficult Installation |
 |
|
| |
|
|
|
|
|
FREE no-obligation
consultation, advice
and quotation:
Call 01905 622 830 |
|
Defence Contractor , New Office
facility, Mid Wales
With a concrete mezzanine floor already built, this Mid Wales Defence
Contractor employed ‘Advantage Storage’ to complete the ground and first floor
interior fit-out.
Aesthetics were of paramount importance so all dividing and internal
partitions were taped, jointed and emulsioned to compliment existing walls. This
‘dry build’ partition system provided a quick build solution with minimum mess!
Works incorporated: feature glazing with etched film manefestations, ‘Jumbo’
wall partitioning with false computer flooring, central heating installation,
internal stud partition offices and an internal staircase with landing.
Services included, recessed Cat 2 lighting, compartment trunking with
electrical sockets, cat 6 data cabling and a small kitchen.
|