Design & Build Case Studies: |
|
Automotive Distributor, Worcester, Before and
After |
|
Fire Service Training, Workshop and Stores
Facilities – Before and After Photographs |
|
Cleanroom Equipment Manufacturer, West Midlands,
Difficult Installation |
|
Medical Instrument Specialist, Gloucestershire |
|
Medical Equipment Offices and Workshop, Cotswolds |
|
Defence Contractor , New Office facility,
Mid Wales |
|
Education Mezzanine Floor, Shropshire College |
|
Cleanroom Equipment Manufacturer, Worcestershire,
Mezzanine Built on Nightshifts |
|
Defence Contractor, Herefordshire, ‘Before and
After’ |
|
Mechanical and Ventilation Services Manufacturer,
West Midlands- Difficult Installation |
 |
|
| |
|
|
|
|
|
FREE no-obligation
consultation, advice
and quotation:
Call 01905 622 830 |
|
Cleanroom Equipment
Manufacturer, West Mids, Difficult Installation
With this West Midlands manufacturer working 24/7, it appeared almost
impossible to build a mezzanine over existing machinery and services.
Close daily liaison between the Advantage Project Manager and the client’s
Engineering Manager proved the key to the success of this project.
By relocating services during the day ready for staged installation of the
Mezzanine on nightshifts, ‘Advantage’ completed this 450 sq.m. floor using
materials lifters to lift steelwork between machines within 3 weeks. Partitions
and electrics were then installed on the first floor.
Shaftwall partitions were built to the perimeter of the new first floor
offices where the system was designed to allow build from the inside rather than
cause any disruption to the busy ground floor production area.
As the main contractor, working with a CDM coordinator, ‘Advantage’ completed
the large fire rated production mezzanine, first floor rest room, boardroom,
office, toilets , vinyl flooring, carpeting, small building works and design and